Sign In | Join Free | My ecer.co.uk |
|
Brand Name : DAO
Model Number : D919
Place of Origin : Jiangsu
MOQ : 1 unit
Price : Variable
Payment Terms : T/T
Supply Ability : 130 units per year
Delivery Time : 15 working days
Packaging Details : Normal
Function : UV CIPP curing
Units : controller, curing, light and blowing
Light : LED or high voltage
Diameter : DN200-1650
Warranty : 12 months
Controller : Hand touch
Integrated UV CIPP Equipment D919 for No digging repair of underground sewers
Integrated UV CIPP D919 is very compact. Trenchless rehab with Daoyunai is faster, higher, and easier. UV CIPP process is perfect to fix underground sewers’ defects, by no digging, a trenchless method. The materials are pulled into the sewer and then to be cured by UV equipment quickly. This process will build a new lining inside the existing sewer, with structural strength. Daoyunai produces the liner and UV equipment. Please visit www.cipp-uv.com for more info.
A section of 50 meters of the underground #sewer with the diameter of DN1650 was repaired without excavation by UV CIPP #Trenchless Technology. UV CIPP trenchless technology is very easy to fix the underground sewers by inserting the liner into the pipe through the exiting manhole, and no need to dig. Daoyunai manufactures the liner from DN200 up to DN1800 with the required thickness.
Function | UV CIPP curing underground sewer |
Units | controller, curing, light and blowing |
Warranty | 12 months |
CIPP UV Cure Equipment D919 Specification.pdf
![]() |
Integrated UV CIPP Equipment D919 For No Digging Repair Underground Sewers Images |